24-Hour Rush RepairCall (949) 400-2937Toll-Free (800) 821-3404Free pick-up & deliveryFree quotes
Top Notch Equipment Repair official logo Schedule Service / Repair Order

Job stories · Rush work

Fresh work that returned machines to the job site.

A look at how rebuilding in-house, machining our own parts and keeping materials on the shelf cut expensive downtime for three customers.

Latest jobs

Genuine rush work on equipment that has to earn — everything from a hydraulic system that quit to complete powertrain and crane-truck rebuilds.

Komatsu wheel loader hydraulic cylinder during a rush rebuildCase study 01

Komatsu wheel loader

Komatsu Wheel Loader — Hydraulic Cylinder Rebuilt Within 12 Hours

Out on a job site, this Komatsu loader sat idle with a hydraulic cylinder that had failed. Within 12 hours the cylinder had been completely rebuilt, and by the next day the customer was working again. Work like this is the reason we keep deep in-house stock of steel and seal kits.

Rebuilt in 12 hoursWorking again the next daySteel & seal kits on the shelf
Cat 305 mini excavator secured on a trailer after repairCase study 02

Cat 305 mini excavator

Cat 305 — Back Running in Two Weeks at Half the Dealer Price

This Cat 305 showed up dead. The Caterpillar dealer had quoted $20,000 for the repair and had parts stuck on backorder. Two weeks later the machine was operating again — and the bill came in 50% under that dealer quote.

Operating within two weeksHalf the dealer quoteArrived not running
Terex T340 40-ton crane truck and rebuilt componentsCase study 03

Terex T340 crane truck

Terex T340 40-Ton Crane Truck — Stranded on Site, Rebuilt in Just 10 Days

This Terex T340 40-ton crane truck went down where it sat on the job site. On a 10-day rush we rebuilt and reconditioned the DEF system, rebuilt several hydraulic cylinders, fitted new crane cables, machined a brand-new rotary gear right here in the shop, carried out a complete rebuild of the 6.7L Cummins diesel engine, and sorted out the electrical system. The crane then earned its certification and passed both smog and DOT inspection.

Rush rebuild in 10 daysRotary gear machined in our shopCertified · Passed smog & DOT